This wiki page is being used for preliminary planning purposes. It does not contain authoritative info on the TIER 2 release.

Currently this is a listing.  The goal is to turn it into a checklist later.

WG TechEx Deliverables Document (kind of a parallel working checklist)

Approx contents of TIER Release 2

**(Q) - How will we "Present" Rel 2 at TechEx?

  • Automated Build from Packaging WG project using Docker
    • Shib 3.2.1, Grouper 2.3, COmanage 1.0.5
    • Complete the build test project that levvel.io is working on
      • Execute the Shib IdP draft test plan PaulC has developed on Shib appliance
        • Shib Appliance available for testing as of 8/19
        • Testing in progress week of 8/22
      • Final Review Build/Test Pipeline Design Doc
      • Review Grouper Design Doc
      • Review COmanage Design Doc
      • Execute Grouper Tests
      • Execute COmanage Tests
    • Review all documentation received from levvel.io
    • Determine how release 2 will be made available to community
      • link to where the VM and Docker can be downloaded (possibly Internet2 Docker Hub)
      • With  levvel.io, we write doc on procedures for obtaining and bringing up the package (for feed into web pages)
  • Instrumentation/Monitoring features for TIER package and each component w monitoring process using Restful API's etc.
    • TIER Central - Deployment Data Site
  • TIER Grouper Deployment Guide - Draft - Present at TechEx (Grouper BOF/ACAMP)
  • Reference Architecture
    • Reference Architecture Overview(s)
    • Use Case Narrative Walk-throughs
  • TIER Roadmap
    • Include what needs to be on the Roadmap through (and beyond) 2017

Approx contents of TIER Workbench Pre-Production

  • Full Suit of Grouper APIs conformant with TIER API Guidelines (Swagger Documented Grouper-TIER-SCIM API)
    in the TIER-packaged Grouper Component
  • Integrate updated components and other software supporting instrumentation/monitoring and rebuild/test
  • Integrate new consent module(s) and rebuild/test (if available)

Approx contents of TIER Workbench BUS Demos

  • Three Two versions

    • With MidPoint as Entity Registry

    • With COmanage as Entity Registry (Nice to have)

    • With COmanage as IAM Package

 

Communications Checklist for TIER Release - Please see Dean's TIER Communications Release 2 Plan spreadsheet .

Below is older info, save for historical and reference purposes:

Update or create these pages

Decide how to receive feedback on  the TIER Release

Announcement emails to 

  • tier-discussion 
  • tier-architecture
  • tier-adopters
  • Internet2 Staff
  • tier-investors
  • tier-CIOs

TIER Release Two Webinar

TIER monthly newsletter

InCommon monthly newsletter

Social Media

  • Twitter
  • Facebook

 

Note on Timing for TIER Release 2 (Bill and Steve's thoughts)

  • Sept. 12, 2016 is goal to have the TIER package ready to demonstrate to working groups
  • Likely not to push out to community until approximately two weeks later

 

 

 

 