2012-01-23 scrum email

Items covered for this sprint

Benn:

Marie:

Scott:

Scruminess

  • What have you done since the previous call?
    • Marie: Worked on CSS for dropdown menus and notifications. Had some meetings.
    • Benn: Cake 2 migration
  • What are you planning to do between now and the next call?
    • Marie: Work on CSS for notification dropdown and some front end logic, paperwork, and current my.ligo.org.
    • Benn: Cake 2 migration
  • Any impediments/stumbling blocks?
    • Marie: None
    • Benn: Poor documentation and a couple of bad early decisions

2012-01-25

Scruminess

  • What have you done since the previous call?
    • Marie: Meetings, paperwork, worked on current myligo
    • Benn: Approximately 4 of 23 controllers migrated to Cake 2


  • What are you planning to do between now and the next call?
    • Marie: Work on CSS for notification dropdown and some front end logic, more current myligo
    • Benn: Hopefully 2 or 3 more by Friday (it should accelerate after that)
  • Any impediments/stumbling blocks?
    • Marie: urrent myligo
    • Benn: Cake 2

2012-01-27

Scruminess

  • What have you done since the previous call?
    • Benn: Only got one more done before running into a cake pagination bug.
    • Marie: meetings, worked on notification dropdown, current myligo
    • Scott: working on CO-202
  • What are you planning to do between now and the next call?
    • Benn: 2 or 3 more by Monday
    • Marie: figure out what the notification system should pass in and how, reupload to Coriander (dev machine) for you guys to poke at
  • Any impediments/stumbling blocks?
    • Benn: Cake2
    • Scott: would like feedback; see comments in CO-202
    • Marie: How flexible should the notification system be? Should the title of each section in notifications be passed in or will there be set categories that will be displayed if they are not empty? I currently have it written with set categories and an "other", but that could easily be changed.