blog to delete

My Blog

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aliquam fermentum vestibulum est. Cras rhoncus. Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Sed quis tortor. Donec non ipsum. Mauris condimentum, odio nec porta tristique, ante neque malesuada massa, in dignissim eros velit at tellus. Donec et risus in ligula eleifend consectetur. Donec volutpat eleifend augue. Integer gravida sodales leo. Nunc vehicula neque ac erat. Vivamus non nisl. Fusce ac magna. Suspendisse euismod libero eget mauris.

Ut ligula. Maecenas consequat. Aliquam placerat. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Nulla convallis. Ut quis tortor. Vestibulum a lectus at diam fermentum vehicula. Mauris sed turpis a nisl ultricies facilisis. Fusce ornare, mi vitae hendrerit eleifend, augue erat cursus nunc, a aliquam elit leo sed est. Donec eget sapien sit amet eros vehicula mollis. In sollicitudin libero in felis. Phasellus metus sem, pulvinar in, porta nec, faucibus in, ipsum. Nam a tellus. Aliquam erat volutpat.

Sed id velit ut orci feugiat tempus. Pellentesque accumsan augue at libero elementum vestibulum. Maecenas sit amet metus. Etiam molestie massa sed erat. Aenean tincidunt. Mauris id eros. Quisque eu ante. Fusce eu dolor. Aenean ultricies ante ut diam. Donec iaculis, pede eu aliquet lobortis, wisi est dignissim diam, ut fringilla eros magna a mi. Nulla vel lorem. Donec placerat, lectus quis molestie hendrerit, ante tortor pharetra risus, ac rutrum arcu odio eu tortor. In dapibus lacus nec ligula. Aenean vel metus. Nunc mattis lorem posuere felis. In vehicula tempus lacus. Phasellus arcu. Nam ut arcu. Duis eget elit id eros adipiscing dignissim.


Image of wireframe


20081015-Agenda in NOLA

PERFORMANCE WORKING GROUP MEETING
AT THE FALL MEMBER MEETING IN NEW ORLEANS, LA
OCTOBER 15, 2008
TIME:   12:00 pm - 1:15 pm

1. Welcome and Announcement of Monthly Meeting Time: (4th Monday of every month at 12pm 11/24) (Carla Hunt)

2. Review/Overview of existing Task Forces (Carla Hunt): (1) Optical/L1 Monitoring, (2) Access Requirements (SAML assertions), (3) Campus and RON guidelines document

3. Update from Campus and RON guidelines Task Force (Ken Lindahl):

Documentation Roadmap Overview -

Three documents:
   document #1. Campus/RON Guidelines
   document #2. Checklist for Measurement Infrastructure Operators (who may also be the same as network operators)
   document #3. Functional Specifications for Developers

Details on Campus/RON Guidelines:
Time line - Finished Document by the next Member Meeting (April 27-29, 2009)
Audience - Measurement Infrastructure and Network Operators
   Purpose - Rationale for using tools/Benefits of building a measurement
infrastructure
Status - We have taken a first pass through the LHC document. Need folks
willing to complete a second review of LHC document and contribute to
revisions.
Next Steps - Ken Lindahl to send Doodle Poll to setup next conference call. Homework for conference call participants.

 4. perfSONAR Update (Jeff Boote)

5. Discussion - challenges with transition of measurement tools and infrastructure from research to operations (Carla Hunt)

challenges implementing end to end performance (i.e outreach to researchers)

20080722-Tentative Agenda

PERFORMANCE WORKING GROUP MEETING
AT JOINT TECHS IN LINCOLN, NEBRASKA
JULY 22, 2008
TIME:   12:30 pm - 1:50 pm

TENTATIVE AGENDA

1. Welcome and introductions

2. Agenda Bash

3. Intellectual property notice

4. Discussion of Background and Goals for the Performance Working Group

  a.  Best practices

  b. Leveraging the Internet2 Observatory

  c. Other. Please add possible Topics for Discussion.

5. Moving Forward: Timing and frequency of WG calls

  • No labels