2011-12-19 call

Attending:

  • Scott Koranda
  • Benn Oshrin
  • Marie Huynh
  • Heather Flanagan

Action Item(s)

1. Benn to contact TSG regarding SVN changes

Self-organization

  • Scrum calls will be held M,W @ 08:00 PST / 10:00 CST / 11:00 EST for 15 minutes
  • Scrum master = Heather
  • A third call will be held Fridays @ 10:00 PST / 12:00 CST / 13:00 EST for up to 60 minutes, to include quick scrum reports and longer dev bashing
  • Next Sprint Planning call: 13 January, 2012 @ 10:00 PST / 12:00 CST / 13:00 EST

Sprint 01

  • first sprint expected to complete 09 January, 2012
  • see items in Jira tagged with "sprint01"
  • since this is more of a "proto-sprint", we won't do the review/retrospective meeting

2011-12-21 call

Attending

  • Heather
  • Benn
  • Marie

A bit more self-organization stuff

  • calls will default to voice (so HF can more easily take notes) and we will switch to IM if folks have another meeting and can still IM

Scruminess

  • What have you done since the previous call?
    • Benn - talked to TSG folks, they are part way through the SVN changes required, which means something of a code freeze for us at the moment; working on the directory prototype
    • Marie - more edits for the formatting, new UI stuff (put in a footer, put in a drop down)
  • What are you planning to do between now and the next call?
    • Benn - directory prototype and code review of Marie's most recent code
    • Marie - code review w/ Benn; try to finish drop downs
  • Any impediments/stumbling blocks?
    • Benn - TSG work and code review
    • Marie - don't have notification system built, so that and the menu will be a placeholder

2011-12-23 call

Attending

  • Benn
  • Scott
  • Marie
  • Heather

Scruminess

  • What have you done since the previous call?
    • Benn - finished the SVN migration to new repository, still working on some of the features (email, anonymous); comanage directory prototype doesn't look much different
    • Marie - had call w/ Benn for code review and made associated edits;
  • What are you planning to do between now and the next call?
    • Benn - focusing on directory stuff
    • Marie - continue testing; call w/ Benn @ 18:00 today for code review; need to retest stuff out of new repository
  • Any impediments/stumbling blocks?
    • Benn - none
    • Marie - none (as long as call happens later today)
    • Scott - will not have anything to report until January

If all work proceeds apace, .3 will be tagged by next call

Dev agenda

  • code guidelines updated (see wiki page)
  • No labels